hello. how to send a notification to the communication center to the user specified in the additional field X when going to the stage, if the value of one additional field X takes one value, and the value of another additional field Z is greater than or equal to 1...
hello. how to send a notification to the communication center to the user specified in the additional field X when going to the stage, if the value of one additional field X takes one value, and the value of another additional field Z is greater than or equal to 1...
There is no direct action to do so. As an option: 1. in the action "Create a notification in the notification center" modify the list of whom to send the notification to - select an additional field with the type "Contact Directory" - it will take 1 hour 2. Either by the action of checking the conditions of the fields, you switch the process to an intermediate status, where the action from paragraph 1 is indicated Or the action "Stop performing the following actions when the conditions are met" - and before the action from paragraph 1, check whether all the conditions are suitable, and if not, stop the execution of the following, actually from paragraph 1 Take a look at the steps, maybe this option will suit you.
There is no direct action to do so.
As an option:
1. in the action "Create a notification in the notification center" modify the list of whom to send the notification to - select an additional field with the type "Contact Directory" - it will take 1 hour
2. Either by the action of checking the conditions of the fields, you switch the process to an intermediate status, where the action from paragraph 1 is indicated
Or the action "Stop performing the following actions when the conditions are met" - and before the action from paragraph 1, check whether all the conditions are suitable, and if not, stop the execution of the following, actually from paragraph 1
Take a look at the steps, maybe this option will suit you.
thanks, in "Stop performing the following actions when conditions are met" only checking one condition, and we have two conditions ... it turns out we need to add two actions "Stop performing the following actions when conditions are met"? And we need to do this at 4 stages, so at each it is necessary to configure this from three actions?
thanks, in "Stop performing the following actions when conditions are met" only checking one condition, and we have two conditions ... it turns out we need to add two actions "Stop performing the following actions when conditions are met"?
And we need to do this at 4 stages, so at each it is necessary to configure this from three actions?
Poltorak Sergey wrote: thanks, in "Stop performing the following actions when conditions are met" only checking one condition, and we have two conditions ... it turns out we need to add two actions "Stop performing the following actions when conditions are met"?
As a solution, yes. First, we checked one field (worked - stopped), then another (worked - stopped), then the notification.
[quote]
Poltorak Sergey wrote:
thanks, in "Stop performing the following actions when conditions are met" only checking one condition, and we have two conditions ... it turns out we need to add two actions "Stop performing the following actions when conditions are met"?
[/quote]
As a solution, yes. First, we checked one field (worked - stopped), then another (worked - stopped), then the notification.
Please join the conversation. If you have something to say - please write a comment. You will need a mobile phone and an SMS code for identification to enter.
Log in and comment
Donate
You don't have enough funds in your account Top up