There are procedures
How much will it cost to modify the button procedures
output as a block to the business process interface.
Give pliz an assessment on points.
The block for displaying procedure buttons has the following settings:
1. Select the procedures that we want to display,
2. There can be N procedures in the block, each has its own button
by default with the name of the procedure, as it is now
3. Set the color of the buttons of the procedures that we display,
as it is now done when setting up procedures
4. Add a field where we display a note when hovering over the button
5. We can use icons for buttons:
- as it is now in the procedures
- add unicode icons like now in the main menu
6. There can be several blocks with procedure buttons,
as now universal interface blocks
7. Blocks with procedure buttons are available for output
to the task interface of the mobile application
8. When we display the button in the block, it is automatically set
the width of such a block by the wide
There are procedures How much will it cost to modify the button procedures output as a block to the business process interface. Give pliz an assessment on points. The block for displaying procedure buttons has the following settings: 1. Select the procedures that we want to display, 2. There can be N procedures in the block, each has its own button by default with the name of the procedure, as it is now 3. Set the color of the buttons of the procedures that we display, as it is now done when setting up procedures 4. Add a field where we display a note when hovering over the button 5. We can use icons for buttons: - as it is now in the procedures - add unicode icons like now in the main menu 6. There can be several blocks with procedure buttons, as now universal interface blocks 7. Blocks with procedure buttons are available for output to the task interface of the mobile application 8. When we display the button in the block, it is automatically set the width of such a block by the wide
And than the current logic of an output of procedures is not convenient? It's just that the task looks like the same thing, only in a different form - I'm not sure that this will be useful to many
And than the current logic of an output of procedures is not convenient?
It's just that the task looks like the same thing, only in a different form - I'm not sure that this will be useful to many
Tyndyk Maxim Vadimovich Administrator wrote: And than the current logic of an output of procedures is not convenient? It's just that the task looks like the same thing, only in a different form - I'm not sure that this will be useful to many
never thought about it what can be convenient to do business processes generally only on procedures, with a minimum of stages? and at the same time place the buttons in the place where they are relevant according to interface logic
[quote]
Tyndyk Maxim Vadimovich
Administrator wrote:
And than the current logic of an output of procedures is not convenient?
It's just that the task looks like the same thing, only in a different form - I'm not sure that this will be useful to many
[/quote]
never thought about it
what can be convenient to do business processes
generally only on procedures, with a minimum of stages?
and at the same time place the buttons in the place
where they are relevant according to interface logic
Tyndyk Maxim Vadimovich Administrator wrote: And than the current logic of an output of procedures is not convenient? It's just that the task looks like the same thing, only in a different form - I'm not sure that this will be useful to many
In my task in the interface, the “payment” block is displayed in which there are three fields, one of them is the payment amount. When money comes to the account, the bukh enters the amount in the field and proceeds to the “payment” procedure, while the task remains at the same stage. I think it would be more convenient if the "payment" procedure was placed not at the bottom of the page along with the stages, but in the interface block. In general, procedures are a very useful thing for me.
[quote]
Tyndyk Maxim Vadimovich
Administrator wrote:
And than the current logic of an output of procedures is not convenient?
It's just that the task looks like the same thing, only in a different form - I'm not sure that this will be useful to many
[/quote]
In my task in the interface, the “payment” block is displayed in which there are three fields, one of them is the payment amount. When money comes to the account, the bukh enters the amount in the field and proceeds to the “payment” procedure, while the task remains at the same stage. I think it would be more convenient if the "payment" procedure was placed not at the bottom of the page along with the stages, but in the interface block.
In general, procedures are a very useful thing for me.
Well, in general, it would be logical to separate the procedures from the buttons for switching stages. Either make it possible, as in the interface settings - just move the buttons, instead of blocks, to the desired row at your own discretion, or add an icon to the buttons to see the difference between the steps / procedures. In any case, I support some kind of separation of the buttons of stages and procedures.
Well, in general, it would be logical to separate the procedures from the buttons for switching stages. Either make it possible, as in the interface settings - just move the buttons, instead of blocks, to the desired row at your own discretion, or add an icon to the buttons to see the difference between the steps / procedures.
In any case, I support some kind of separation of the buttons of stages and procedures.
Vyacheslav, according to your description, the score on the points: 1. 6h - procedures are displayed in a static block in the form that they were created (name + color + icon) 2. +2h - editing the name inside the block (to be different from the name of the procedure) 3. +2h - color editing inside the block (to be different from the procedure) 4. +2h 5. +2h 6. +1h (make 5 blocks for example) 7. +12h 8. +1h 9. +3h 10. +3h 11. +4h
Vyacheslav, according to your description, the score on the points:
1. 6h - procedures are displayed in a static block in the form that they were created (name + color + icon)
2. +2h - editing the name inside the block (to be different from the name of the procedure)
3. +2h - color editing inside the block (to be different from the procedure)
4. +2h
5. +2h
6. +1h (make 5 blocks for example)
7. +12h
8. +1h
9. +3h
10. +3h
11. +4h
Tyndyk Maxim Vadimovich Administrator wrote: Vyacheslav, according to your description, the score on the points: 1. 6h - procedures are displayed in a static block in the form that they were created (name + color + icon) 2. +2h - editing the name inside the block (to be different from the name of the procedure) 3. +2h - color editing inside the block (to be different from the procedure) 4. +2h 5. +2h 6. +1h (make 5 blocks for example) 7. +12h 8. +1h 9. +3h 10. +3h 11. +4h
Max, thanks counted a total of 38 hours = $1140 there is a goal to make cool functionality
[quote]
Tyndyk Maxim Vadimovich
Administrator wrote:
Vyacheslav, according to your description, the score on the points:
1. 6h - procedures are displayed in a static block in the form that they were created (name + color + icon)
2. +2h - editing the name inside the block (to be different from the name of the procedure)
3. +2h - color editing inside the block (to be different from the procedure)
4. +2h
5. +2h
6. +1h (make 5 blocks for example)
7. +12h
8. +1h
9. +3h
10. +3h
11. +4h
[/quote]
Max, thanks
counted a total of 38 hours = $1140
there is a goal to make cool functionality
Tyndyk Maxim Vadimovich Administrator wrote: Vyacheslav, according to your description, the score on the points: 1. 6h - procedures are displayed in a static block in the form that they were created (name + color + icon) 2. +2h - editing the name inside the block (to be different from the name of the procedure) 3. +2h - color editing inside the block (to be different from the procedure) 4. +2h 5. +2h 6. +1h (make 5 blocks for example) 7. +12h 8. +1h 9. +3h 10. +3h 11. +4h
Max, thanks counted a total of 38 hours = $1140 there is a goal to make cool functionality
It still needs to be approved the correct appearance, so that later it doesn’t turn out that you need to do improvements for improvements ...
[quote]
Legeza Vyacheslav Valerianovich
FOP Legeza Vyacheslav Valerianovich wrote:
[quote]
Tyndyk Maxim Vadimovich
Administrator wrote:
Vyacheslav, according to your description, the score on the points:
1. 6h - procedures are displayed in a static block in the form that they were created (name + color + icon)
2. +2h - editing the name inside the block (to be different from the name of the procedure)
3. +2h - color editing inside the block (to be different from the procedure)
4. +2h
5. +2h
6. +1h (make 5 blocks for example)
7. +12h
8. +1h
9. +3h
10. +3h
11. +4h
[/quote]
Max, thanks
counted a total of 38 hours = $1140
there is a goal to make cool functionality
[/quote]
It still needs to be approved the correct appearance, so that later it doesn’t turn out that you need to do improvements for improvements ...
Tyndyk Maxim Vadimovich Administrator wrote: Vyacheslav, according to your description, the score on the points: 1. 6h - procedures are displayed in a static block in the form that they were created (name + color + icon) 2. +2h - editing the name inside the block (to be different from the name of the procedure) 3. +2h - color editing inside the block (to be different from the procedure) 4. +2h 5. +2h 6. +1h (make 5 blocks for example) 7. +12h 8. +1h 9. +3h 10. +3h 11. +4h
Max, thanks counted a total of 38 hours = $1140 there is a goal to make cool functionality
It still needs to be approved the correct appearance, so that later it doesn’t turn out that you need to do improvements for improvements ...
almost like that, Michael appearance of OneBox spices make based on the overall design
[quote]
Kornev Mikhail
Ergo wrote:
[quote]
Legeza Vyacheslav Valerianovich
FOP Legeza Vyacheslav Valerianovich wrote:
[quote]
Tyndyk Maxim Vadimovich
Administrator wrote:
Vyacheslav, according to your description, the score on the points:
1. 6h - procedures are displayed in a static block in the form that they were created (name + color + icon)
2. +2h - editing the name inside the block (to be different from the name of the procedure)
3. +2h - color editing inside the block (to be different from the procedure)
4. +2h
5. +2h
6. +1h (make 5 blocks for example)
7. +12h
8. +1h
9. +3h
10. +3h
11. +4h
[/quote]
Max, thanks
counted a total of 38 hours = $1140
there is a goal to make cool functionality
[/quote]
It still needs to be approved the correct appearance, so that later it doesn’t turn out that you need to do improvements for improvements ...
[/quote]
almost like that, Michael
appearance of OneBox spices
make based on the overall design
Please join the conversation. If you have something to say - please write a comment. You will need a mobile phone and an SMS code for identification to enter.
Log in and comment
Donate
You don't have enough funds in your account Top up