It ceased to be practiced, not copied, although nothing has changed in the customizations. So far, everything was OK, what could be wrong? Fields that are copied to the same type "dropdown list" can be seen and reinstalled - did not help
It ceased to be practiced, not copied, although nothing has changed in the customizations. So far, everything was OK, what could be wrong? Fields that are copied to the same type "dropdown list" can be seen and reinstalled - did not help
You have this action on the stage that copies the Flow to the Course Flow. And this process has an additional product field filled. You may need to display it in the process interface to see that the action worked.
You have this action on the stage that copies the Flow to the Course Flow. And this process has an additional product field filled. You may need to display it in the process interface to see that the action worked.
It is logical that it is filled, because we put it down with our hands. This action is at the starting stage and when the lead enters the system, the action should automatically put down the "Flow" by copying this field from the product, depending on the addition of the product. The product is added, but the action does not work, although everything worked for about a month, how to find and fix the problem?
It is logical that it is filled, because we put it down with our hands. This action is at the starting stage and when the lead enters the system, the action should automatically put down the "Flow" by copying this field from the product, depending on the addition of the product. The product is added, but the action does not work, although everything worked for about a month, how to find and fix the problem?
You did not have a process product at the time of transition to the stage. The product was most likely added later Check the box to make the action work on saving as well, or add a product before going to the stage
You did not have a process product at the time of transition to the stage. The product was most likely added later
Check the box to make the action work on saving as well, or add a product before going to the stage
Can you now give a link to the process in which the product was before switching to the status; it did not fill in the required field and is now in this status?
Can you now give a link to the process in which the product was before switching to the status; it did not fill in the required field and is now in this status?
Please join the conversation. If you have something to say - please write a comment. You will need a mobile phone and an SMS code for identification to enter.