1b.app
Link copied -

action work

Good afternoon. At the stage: https://onebox.spacehall.com.ua/admin/shop/workflowstatus/124/action/new/ I use two actions: Switch the stage after x transitions to the current stage and Switch to the stage instantly. They stand in this sequence, and they must switch to different stages. That is, in theory, it should first work out the action that is standing first and if the process goes to this stage x times or more, switch to the stage specified in the settings of this action. If the process goes to the stage less than x times, then the second action in turn should be triggered and switch the process to the stage specified in its settings. However, by the way everything happens in practice: https://onebox.spacehall.com.ua/admin/customorder/issue/101989/edit/ one gets the feeling that both of these actions are being worked out, because at first the process (for x or more transition to the stage where these actions are located) switches to the stage specified in the settings of the firs
Original question is available on version: ru

Answers:


in order for this action to transfer to the status and then do nothing, you need to add a condition there (as in the action Change the business process and stage depending on the field values - Do not run the following actions at this stage if this action has transferred the process to the status)
such revision 3h
08.10.2021, 19:43
Original comment available on version: ru

understood you
I'll try to structure the process differently
11.10.2021, 11:39
Original comment available on version: ru

Please join the conversation. If you have something to say - please write a comment. You will need a mobile phone and an SMS code for identification to enter. Log in and comment