There are several questions, did the integration:
1) when the integration was connected, the lists of applications were loaded from PROM, but in the reverse order. Those old application is at the very top, maybe during the first integration?
2) There was a trace problem, there are 1000 goods on the prom, I don’t want to stuff them into the onebox, because there is a lot of rubbish. And after receiving the application, a product is created in the warehouse with industrial
and go in to edit the product, add it to the category, I don’t want to credit it, because you don’t know if the supplier will have it
How can this process be simplified after creating a new product, for example, add an additional field, and the manager will already create a NEW product if we can fulfill this order
because now the goods are being created, but it is not possible to go to the ORDER confirmed, because there is a reservation of the goods in the warehouse
There are several questions, did the integration: 1) when the integration was connected, the lists of applications were loaded from PROM, but in the reverse order. Those old application is at the very top, maybe during the first integration? 2) There was a trace problem, there are 1000 goods on the prom, I don’t want to stuff them into the onebox, because there is a lot of rubbish. And after receiving the application, a product is created in the warehouse with industrial and go in to edit the product, add it to the category, I don’t want to credit it, because you don’t know if the supplier will have it How can this process be simplified after creating a new product, for example, add an additional field, and the manager will already create a NEW product if we can fulfill this order because now the goods are being created, but it is not possible to go to the ORDER confirmed, because there is a reservation of the goods in the warehouse
set "Limit for unloading processes (maximum number - 5000, if empty - 100)" - by 5 in "Automatic once per minute" synchronized five orders and stopped there after half an hour I made a test order and the last order was pulled up, so the first question is most likely not relevant left the second =)
set "Limit for unloading processes (maximum number - 5000, if empty - 100)" - by 5 in "Automatic once per minute"
synchronized five orders and stopped there
after half an hour I made a test order and the last order was pulled up, so the first question is most likely not relevant
left the second =)
[file]16500[/file]
the reservation action has a checkbox "Allow to proceed to the stage if the product could not be reserved", with its help you will be able to proceed to the stage even if the product could not be reserved
the reservation action has a checkbox "Allow to proceed to the stage if the product could not be reserved", with its help you will be able to proceed to the stage even if the product could not be reserved
for example, I have three positions on prom: Belt bag (Code 83838) Belt bag (Code 93733) Colored belt bag (Code 93733) but in fact it is the same bag, why should I produce 10 products in the CRM when it is one product? the manager came in and set up the right product
for example, I have three positions on prom:
Belt bag (Code 83838)
Belt bag (Code 93733)
Colored belt bag (Code 93733)
but in fact it is the same bag, why should I produce 10 products in the CRM when it is one product? the manager came in and set up the right product
For example, the same gloves, on the prom - there are 10 of them with different prices, on the outlet - there are 5 of them There will be 15 of them in total in onebox ?? would not like and they have different IDs and articles
For example, the same gloves, on the prom - there are 10 of them with different prices, on the outlet - there are 5 of them
There will be 15 of them in total in onebox ?? would not like
and they have different IDs and articles
[file]16516[/file]
Well, usually in such cases, the box is made the main one and, as a result, 1 product is unloaded both on the prom and on the outlet with reference to the id or external id of the product in the box. You can also search by name, for example
Well, usually in such cases, the box is made the main one and, as a result, 1 product is unloaded both on the prom and on the outlet with reference to the id or external id of the product in the box. You can also search by name, for example
Da Hong Pao OneBox production wrote: Well, usually in such cases, the box is made the main one and, as a result, 1 product is unloaded both on the prom and on the outlet with reference to the id or external id of the product in the box. You can also search by name, for example
Well, when the online store was created, I didn’t even know about boxing)) now I have to tighten everything under it, are there any options?
[quote]
Da Hong Pao
OneBox production wrote:
Well, usually in such cases, the box is made the main one and, as a result, 1 product is unloaded both on the prom and on the outlet with reference to the id or external id of the product in the box. You can also search by name, for example
[/quote]
Well, when the online store was created, I didn’t even know about boxing)) now I have to tighten everything under it, are there any options?
what if you use it like this? like the product came in crm, but it was not added to the products like "Add dummy products to the order if the product is not found (by default, a new product is created)"
what if you use it like this? like the product came in crm, but it was not added to the products like
"Add dummy products to the order if the product is not found (by default, a new product is created)"
[file]16517[/file]
[file]16518[/file]
Da Hong Pao OneBox production wrote: You can try searching by name. Does the name match the actual product?
Tell me can you do it on the promo was: product 1 - "Mini Varior tactical bag olive" Article 579 CODE 933283838 item 2 - "Olive belt bag" Article 580 CODE 1231233123 and in CRM create a product Item 1 "Tactical bag Oliva" and the article 580, 579 and codes were written in it those upon receipt of this product, it pulled up the product according to the article or code in the CPM, and the product in the CPM will have several articles or codes indicated
[quote]
Da Hong Pao
OneBox production wrote:
You can try searching by name. Does the name match the actual product?
[/quote]
Tell me can you do it
on the promo was:
product 1 - "Mini Varior tactical bag olive" Article 579 CODE 933283838
item 2 - "Olive belt bag" Article 580 CODE 1231233123
and in CRM create a product
Item 1 "Tactical bag Oliva"
and the article 580, 579 and codes were written in it
those upon receipt of this product, it pulled up the product according to the article or code in the CPM, and the product in the CPM will have several articles or codes indicated
there are such things. In theory, you can create 1 product, create X additional fields and enter an article or id on the promo in each of the additional fields. And in the action of importing orders, we will finalize so that the article is searched in the list of these additional fields. In total, you will have 10 additional fields with articles in one product, and when ordering any of the goods with such an article, we will add only the product with the desired article in the additional field to the order. Takes 2 hours like this
[file]16548[/file] there are such things. In theory, you can create 1 product, create X additional fields and enter an article or id on the promo in each of the additional fields. And in the action of importing orders, we will finalize so that the article is searched in the list of these additional fields. In total, you will have 10 additional fields with articles in one product, and when ordering any of the goods with such an article, we will add only the product with the desired article in the additional field to the order. Takes 2 hours like this