Test process https://box.vals.net.ua/admin/customorder/order/23665/edit/
In the settings for integration with NP there are settings [file]8906[/file] [file]8907[/file]
The field in the process is filled before the transition to the stage at which the TTN is formed [file]8908[/file]
Previously, the formation of TTN with payment control worked.
Please clarify what is wrong?
Test process https://box.vals.net.ua/admin/customorder/order/23665/edit/ In the settings for integration with NP there are settings The field in the process is filled before the transition to the stage at which the TTN is formed Previously, the formation of TTN with payment control worked. Please clarify what is wrong?
The food is not relevant. Having added the procedure, on nіy nalashtuvav absolutely the same diї і everything was ordered. Adding the launch of the procedure to the required stage.
The food is not relevant. Having added the procedure, on nіy nalashtuvav absolutely the same diї і everything was ordered. Adding the launch of the procedure to the required stage.
Please join the conversation. If you have something to say - please write a comment. You will need a mobile phone and an SMS code for identification to enter.
Log in and comment
Donate
You don't have enough funds in your account Top up