Good afternoon, we have encountered a situation where if an order is open in two tabs, and the stage is switched on one of them, then when adding a product in the other tab, the product is added and saved in the order, which later causes problems, because the process goes further down the funnel.
Can you add an error when adding a product if the process stage is changed by analogy with switching the stage?
Good afternoon, we have encountered a situation where if an order is open in two tabs, and the stage is switched on one of them, then when adding a product in the other tab, the product is added and saved in the order, which later causes problems, because the process goes further down the funnel. Can you add an error when adding a product if the process stage is changed by analogy with switching the stage?
Rodion wrote: and is saved in the order, which later causes problems, since the process goes further down the funnel.
Good afternoon. And how exactly do you switch stages further - perhaps it would be better for you to improve the checks so that the stage is not switched if it is not connected to specific actions?
[quote]
Rodion wrote:
and is saved in the order, which later causes problems, since the process goes further down the funnel.
[/quote]
Good afternoon.
And how exactly do you switch stages further - perhaps it would be better for you to improve the checks so that the stage is not switched if it is not connected to specific actions?
Switching of a stage occurs through a process, i.e. transition to a related stage. To simplify, there are, for example, 2 stages: Start and Create an order to the supplier, - the same process is open in two tabs, - in the first one we moved to the Create an order to the supplier stage, - in the second one we added the product, as a result, the process at the stage where orders to suppliers should have been created, but the goods were added after the transition
Switching of a stage occurs through a process, i.e. transition to a related stage.
To simplify, there are, for example, 2 stages: Start and Create an order to the supplier,
- the same process is open in two tabs,
- in the first one we moved to the Create an order to the supplier stage,
- in the second one we added the product,
as a result, the process at the stage where orders to suppliers should have been created, but the goods were added after the transition
Rodion wrote: as a result, the process at the stage, upon transition to which orders to suppliers should have been created, but the goods were added after the transition
add action "Prohibit adding product to business process" at the stage of creating orders to the supplier, get an error
[quote]
Rodion wrote:
as a result, the process at the stage, upon transition to which orders to suppliers should have been created, but the goods were added after the transition
[/quote]
add action "Prohibit adding product to business process" at the stage of creating orders to the supplier, get an error
as an option, but we have several dozen stages to which the process can be transferred, it turns out to be necessary to manually add to everything and remember when adding new stages in the future what needs to be added
as an option, but we have several dozen stages to which the process can be transferred, it turns out to be necessary to manually add to everything and remember when adding new stages in the future what needs to be added